The Valley Line West project consists of two elevated stations and 14 at-grade stations that will connect the Edmonton downtown core to Lewis Farms. Across elevated stations and surface stops, the platform and shelter elements are integrated into the surrounding public realm, coordinating sidewalk and plaza tie-ins, pedestrian, cycling interfaces, landscaping/streetscape, lighting, CPTED considerations, and accessible routes. This results in each stop functioning as a seamless extension of the street network rather than a standalone object.